Which of the following is not a change steve should make to the contract before he signs it? a. steve needs to increase the total cost from $300.00 to $500.00. b. steve needs a clause about the cost of rental equipment as janice’s responsibility. c. steve needs a clause about his hourly rate, regardless of the time it takes to finish the job. d. steve needs to remove the total cost of $300.00 in case the job takes longer than originally expected.

asked
User PieCot
by
8.8k points

1 Answer

10 votes

Answer:

I believe its a: steve needs to increase the total cost from $300.00 to $500.00.