asked 11.6k views
1 vote
Type the correct answer in the box.

A team of geologists is surveying glaciers on a mountain. They come across a newly formed stream. The stream is flowing at an average rate of 420 cubic meters per minute.
At the average rate of flow, the stream will produce 14,700 cubic meters of water in _ minutes.

asked
User Neeru
by
7.7k points

1 Answer

7 votes

Answer:

it is 35 mins

answered
User Blivet
by
8.4k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.