asked 223k views
4 votes
At a construction site, cement, sand, and gravel are mixed to make concrete. The ratio of cement to sand to gravel is 1 to 2.5 to 3.5. If a 100-lb bag of sand is used, how much cement and gravel must be used? Round the answers to the nearest hundredth of a pound, if necessary.

asked
User Sweber
by
8.1k points

1 Answer

6 votes
To figure this out take the sim of the tangent and multiply it by the resulting vectors of the two quantity and your left with frosty
answered
User Ervis
by
8.5k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.