AREA SHALL BE REDONE IN ACCORDANCE WITH REQUIREMENTS IF MORE THAN __ DAYS PASS BEFORE PRIMER IS TOPCOATED

1 Answer

0 votes

Final answer:

The question deals with construction guidelines regarding the timeframe for applying topcoat over primer. The period can differ but usually falls between 1 and 14 days after primer application.

Step-by-step explanation:

The question pertains to a guideline or a specification in an engineering or construction context, specifically related to the application of primer and topcoat on a surface. The exact number of days that can pass before a primer needs to be topcoated can vary depending on the manufacturer's recommendations, the specific materials used, and the environmental conditions. However, it is a common practice in the industry to apply the topcoat within a certain period, typically ranging from 1 to 14 days. If this timeframe is exceeded, the primer's effectiveness may decrease, necessitating surface preparation and reapplication of the primer to ensure proper adhesion and protection before topcoating.

answered
User Veles
by
8.5k points