asked 70.1k views
2 votes
The relationship between training costs (x) and productivity (y) is given by the following formula:

y=8x−4x²+38.

Will Nonlinear Solver be guaranteed to identify the level of training that maximizes productivity? Yes or No?

1 Answer

3 votes

Final answer:

Nonlinear Solver will not be guaranteed to identify the level of training that maximizes productivity.

Step-by-step explanation:

No, Nonlinear Solver will not be guaranteed to identify the level of training that maximizes productivity. This is because the relationship between training costs and productivity in the given formula is a quadratic equation, which represents a nonlinear relationship. Nonlinear Solver is designed to solve linear equations, so it may not accurately determine the maximum level of productivity in this case.

answered
User Jirinovo
by
8.3k points