asked 11.4k views
4 votes
Working together, Shawn and Hector can install a tile floor in 6 hours. It would take Shawn 9 hours to do the job alone. What is the value of r, the part of the tile that Hector could install in 1 hour?

asked
User FalcoGer
by
7.9k points

2 Answers

6 votes

Answer:

a. 1/18

Step-by-step explanation: just took the test

answered
User Simon Moshenko
by
8.0k points
2 votes
The product of the sum of the their rates and the time it took them to finish the job should be equal to one whole job. This may be expressed by the equation,
(1/9 + r) x 6 = 1
Solving for the value of r gives an answer of r = 1/18. Thus, Hector does 1/18 of the job in 1 hour.
answered
User Alevtina
by
8.5k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.