asked 227k views
4 votes
Determine the approximate force (N) used to pull a sled up a 400 m hill using 1900 J of work.

0.2N

800,000N

500N

5N

asked
User Mallori
by
8.0k points

1 Answer

4 votes
The work done to pull the sled up to the hill is given by

W=Fd
where
F is the intensity of the force
d is the distance where the force is applied.

In our problem, the work done is
W=1900 J and the distance through which the force is applied is
d=400 m, so we can calculate the average force by re-arranging the previous equation and by using these data:

F= (W)/(d)= (1900 J)/(400 m) = 4.75 N \sim 5 N
answered
User Sneaky
by
7.6k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.