Marigold, Inc. uses activity-based costing as the basis for information to set prices for its six lines of seasonal coats.

Activity Cost Pools Estimated Overhead Estimated Use of Cost Drivers per Activity
Designing $445,200 10,600 designer hours
Sizing and cutting 4,081,200 152,000 machine hours
Stitching and trimming 1,491,000 84,000 labor hours
Wrapping and packing 346,500 33,000 finished units

Compute the activity-based overhead rates using the following budgeted data for each of the activity cost pools.

Designing
Sizing and cutting
Stitching and trimming
Wrapping and packing

asked
User Danyell
by
8.3k points

1 Answer

2 votes

Answer:

Designing= $42 per designer hour

Sizing and cutting= $26.85 per machine hour

Stitching and trimming= $17.75 per labor hour

Wrapping and packing= $10.5 finished unit

Step-by-step explanation:

To calculate the activity-based overhead rates, we need to use the following formula:

Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base

Designing= 445,200/10,600= $42 per designer hour

Sizing and cutting= 4,081,200/152,000= $26.85 per machine hour

Stitching and trimming= 1,491,000/84,000= $17.75 per labor hour

Wrapping and packing= 346,500/33,000= $10.5 finished unit