asked 19.9k views
5 votes
A construction company can remove 3/4 tons of dirt from a construction site each hour. How long will it take them to remove 24 tons of dirt from the site?

1 Answer

2 votes

Answer:

32 hours

Explanation:

Given


Rate= (3)/(4)\ tons\ per\ hour

Required

Determine time taken for 24 tons

As used in this question, Rate is the ratio of tons of dirt to time.

i.e.


Rate = (Tons\ of\ Dirt)/(Time)

Let t represents time when tons of dirt is 24 tons:


Rate = (24)/(t)

Recall that:
Rate= (3)/(4)\ tons\ per\ hour

So, we have


(24)/(t) = (3)/(4)

Cross Multiply


3 * t = 24 * 4

Divide both sides by 3


t = 8 * 4


t = 32

Hence, time taken is 32 hours

answered
User Krithika Vittal
by
7.6k points

No related questions found

Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.