What if the meaning of the cumulative EAC (cell M105) at the conclusion of Period 6?

asked
User Moni
by
7.7k points

1 Answer

2 votes

Answer:

The meaning of the cumulative EAC ( cell M105 ) at the conclusion of period 6 is the total accumulation of the cost inquired within the period expressed as a percentage of the cost of completed tasks to the accumulating costs set aside for the entirety of the task.

Step-by-step explanation:

The meaning of the cumulative EAC ( cell M105 ) at the conclusion of period 6 is the total accumulation of the cost inquired within the period expressed as a percentage of the cost of completed tasks to the accumulating costs set aside for the entirety of the task.

EAC ( estimate at completion ) is the estimation of the cost of the final cost of a project,and it is estimated based on the performance of the project at completion

answered
User Oussama Kamal
by
7.9k points