asked 27.3k views
3 votes
Suppose the sediment density (g/cm) of a randomly selected specimen from a certain region is normally distributed with mean 2.68 and standard deviation 0.92.

A. If a random sample of 25 specimens is selected, what is theprobability that the sample average sediment density is at most3.00? Between 2.68 and 3.00
B. How large a sample size would be required to ensure thatthe first probability in part (a) is at least .99 ?

asked
User Tgf
by
7.4k points

1 Answer

4 votes

Answer:

The sample size must be 45 large enough that would ensure that the first probability in part (a) is at least 0.99.

Explanation:

We are given that the sediment density (g/cm) of a randomly selected specimen from a certain region is normally distributed with mean 2.68 and standard deviation 0.92.

Let
\bar X = sample average sediment density

The z-score probability distribution for the sample mean is given by;

Z =
(\bar X-\mu)/((\sigma)/(√(n) ) ) ~ N(0,1)

where,
\mu = population mean = 2.68


\sigma = population standard deviation = 0.92

n = sample of specimens = 25

(a) The probability that the sample average sediment density is at most 3.00 is given by = P(
\bar X
\leq 3.00)

P(
\bar X
\leq 3.00) = P(
(\bar X-\mu)/((\sigma)/(√(n) ) )
\leq
(3.00-2.68)/((0.92)/(√(25) ) ) ) = P(Z
\leq 1.74) = 0.9591

The above probability is calculated by looking at the value of x = 1.74 in the z table which has an area of 0.9591.

Also, the probability that the sample average sediment density is between 2.68 and 3.00 is given by = P(2.68 <
\bar X < 3.00)

P(2.68 <
\bar X < 3.00) = P(
\bar X < 3.00) - P(
\bar X
\leq 2.68)

P(
\bar X < 3.00) = P(
(\bar X-\mu)/((\sigma)/(√(n) ) ) <
(3.00-2.68)/((0.92)/(√(25) ) ) ) = P(Z < 1.74) = 0.9591

P(
\bar X
\leq 2.68) = P(
(\bar X-\mu)/((\sigma)/(√(n) ) )
\leq
(2.68-2.68)/((0.92)/(√(25) ) ) ) = P(Z
\leq 0) = 0.50

The above probability is calculated by looking at the value of x = 1.74 and x = 0 in the z table which has an area of 0.9591 and 0.50.

Therefore, P(2.68 <
\bar X < 3.00) = 0.9591 - 0.50 = 0.4591.

(b) Now, we have to find a sample size that would ensure that the first probability in part (a) is at least 0.99, that is;

P(
\bar X
\leq 3.00)
\geq 0.99

P(
(\bar X-\mu)/((\sigma)/(√(n) ) )
\leq
(3.00-2.68)/((0.92)/(√(n) ) ) )
\geq 0.99

P(Z
\leq
(3.00-2.68)/((0.92)/(√(n) ) ) )
\geq 0.99

Now, in the z table; the critical value of x which has an area of at least 0.99 is given by 2.3263, that is;


(3.00-2.68)/((0.92)/(√(n) ) )=2.3263


√(n) } }=( 2.3263* 0.92)/(0.32)


√(n) } }=6.69

n = 44.76 ≈ 45 {By squaring both sides}

Hence, the sample size must be 45 large enough that would ensure that the first probability in part (a) is at least 0.99.

answered
User Lumnezia
by
8.8k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.