Kunkel Company makes two products and uses a conventional costing system in which a single plantwide predetermined overhead rate is computed based on direct labor-hours. Data for the two products for the upcoming year follow:

Mercon Wurcon
Direct materials cost per unit $ 9.00 $ 7.00
Direct labor cost per unit $15.00 $ 17.00
Direct labor-hours per unit 0.40 4.80
Number of units produced 4,000 8,000
These products are customized to some degree for specific customers.
Required:
1. The company's manufacturing overhead costs for the year are expected to be $1,600,000. Using the company's conventional costing system, compute the unit product costs for the two products.
2. Management is considering an activity-based costing system in which half of the overhead would continue to be allocated on the basis of direct labor-hours and half would be allocated on the basis of engineering design time. This time is expected to be distributed as follows during the upcoming year:
Mercon Wurcon Total
Engineering design time (in hours) 8,000 8,000 16,000
Compute the unit product costs for the two products using the proposed ABC system.

asked
User Majella
by
8.1k points

1 Answer

4 votes

Answer:

Instructions are below.

Step-by-step explanation:

Giving the following information:

Mercon Wurcon

Direct materials cost per unit $ 9.00 $ 7.00

Direct labor cost per unit $15.00 $ 17.00

Direct labor-hours per unit 0.40 4.80

Number of units produced 4,000 8,000

A. First, we need to calculate the predetermined overhead rate:

Total direct labor hours= 0.4*4,000 + 4.8*8,000= 40,000

Overhead= 1,600,000

Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base

Predetermined manufacturing overhead rate= 1,600,000/40,000

Predetermined manufacturing overhead rate= $40 per direct labor hour

Now, we can determine the unitary product cost.

Mercon= 9 + 15 + 40*0.4= $37

Wurcon= 7 + 17 + 4.8*40= $216

B.

Mercon Wurcon Total

Engineering design time (in hours) 8,000 8,000 16,000

Now, we have two different allocation rates:

Direct-labor hours= 800,000/40,000= $20 per direct labor hour

Engineer desing= 800,000/16,000= $50 per engineer desing hour

Finally, we can determine the unitary product cost:

Engineer design per unit:

Mercon= 8,000/4,000= 2

Wurcon= 8,000/8,000= 1

Mercon= 9 + 15 + (20*0.4 + 50*2) = $132

Wurcon= 7 + 17 + (20*4.8 + 50*1)= $170