5. A worker can do a piece of

piece of wook
in 14 days.
How much coook does he do ini day!
. How much work does he do in 7 days?
lijIt he works for 2 days and leaves,
how much work is left to finish it?

asked
User Vmp
by
8.5k points

1 Answer

3 votes

Answer:

therefore the left work of worker will be 6/7 part of work