asked 110k views
0 votes
The local amusement park was interested in the average wait time at their most popular roller coaster at the peak park time (2 p.m.). They selected 13 patrons and had them get in line between 2 and 3 p.m. Each was given a stopwatch to record the time they spent in line. The times recorded were as follows (in minutes).

118, 124, 108, 116, 99, 120, 148, 118, 119, 121, 45, 130, 118
What is the IQR?

asked
User Antgel
by
8.1k points

1 Answer

7 votes
The IQR is 2 because 120-118=2
answered
User Dequin
by
9.1k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.