menu
Qamnty
Login
Register
My account
Edit my Profile
Private messages
My favorites
A roller coaster travels 80 ft of track from the loading zone before reaching its peak. The horizontal distance between the loading zone and the base of the peak is 50 ft. At wh…
Ask a Question
Questions
Unanswered
Tags
Ask a Question
A roller coaster travels 80 ft of track from the loading zone before reaching its peak. The horizontal distance between the loading zone and the base of the peak is 50 ft. At wh…
asked
May 18, 2021
70.2k
views
3
votes
A roller coaster travels 80 ft of track from the loading zone before reaching its peak. The horizontal distance between the loading zone and the base of the peak is 50 ft. At what angle, to the nearest degree, is the roller coaster rising?
Mathematics
college
Nate Flink
asked
by
Nate Flink
8.5k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
2
Answers
7
votes
Answer:
30.83ft
Explanation:
Manxing
answered
May 21, 2021
by
Manxing
8.3k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
4
votes
Answer:
the answer is answer b, or 30.83ft
Explanation:
Juanferrer
answered
May 23, 2021
by
Juanferrer
7.3k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
Related questions
asked
May 9, 2024
81.4k
views
Suppose a theme park roller coaster has a train with six carriages. Each carriage takes eight customers. Trains arrive to the loading point one every 30 seconds. However, each hour, on the hour, the roller
Oussama Gammoudi
asked
May 9, 2024
by
Oussama Gammoudi
8.2k
points
Business
college
1
answer
5
votes
81.4k
views
asked
Sep 17, 2024
196k
views
a 4768-kg roller coaster train full of riders approaches the loading dock at a speed of 17.1 m/s. It is abruptly decelerated to a speed of 2.2 m/s over a distance of 13.6m. Determine the magnitude of the
Adam Bergmark
asked
Sep 17, 2024
by
Adam Bergmark
8.6k
points
Physics
high-school
1
answer
1
vote
196k
views
asked
Apr 21, 2024
1.3k
views
A 4260-kg roller coaster train full of riders approaches the level loading dock at a speed of 19.0 m/s. It is abruptly decelerated to a speed of 3.2 m/s. Determine the work done on the roller coaster.
Silvan Bregy
asked
Apr 21, 2024
by
Silvan Bregy
7.8k
points
Physics
college
1
answer
2
votes
1.3k
views
Ask a Question
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.
Categories
All categories
Mathematics
(3.7m)
History
(955k)
English
(903k)
Biology
(716k)
Chemistry
(440k)
Physics
(405k)
Social Studies
(564k)
Advanced Placement
(27.5k)
SAT
(19.1k)
Geography
(146k)
Health
(283k)
Arts
(107k)
Business
(468k)
Computers & Tech
(195k)
French
(33.9k)
German
(4.9k)
Spanish
(174k)
Medicine
(125k)
Law
(53.4k)
Engineering
(74.2k)
Other Questions
How do you can you solve this problem 37 + y = 87; y =
What is .725 as a fraction
i have a field 60m long and 110 wide going to be paved i ordered 660000000cm cubed of cement how thick must the cement be to cover field
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qamnty