Answer:
277 sheets 
Step-by-step explanation:
As per the data given in the question, 
 
Z at 95% = 1.64485 
Safety stock = Z × Standard deviation × (Lead time + Period)^(1÷ 2)
= 1.64485 × 5 × (6+28)^(1÷ 2)
= 47.955 
Daily demand = 4500 ÷ 365 
= 12.33 
Reorder point = (Daily demand × (lead time + period)) + safety stock 
= (12.33 × (28 + 6)) + 47.955 
= 467.175 
Sheets to be ordered = Reorder point - sheets in hand 
= 467.175 - 190 
= 277.175 
= 277 sheets