asked 132k views
2 votes
A 5% upgrade on a six-lane freeway (three lanes in each direction) is 1.25 mi long. On thissegment of freeway, there is 3% SUTs and 7% TTs, and the peak hour factor is 0.9. The lanes are 12ft wide, there is no lateral obstructions within 6ft from the roadway, and the total ramp density is 1.0 ramps per mile. What is the maximum directional peak-hour volume that can be accommodated without exceeding LOS C operating conditions

1 Answer

4 votes

Answer:

3.586.543veh/hr

Step-by-step explanation:

A 5% upgrade on a six-lane freeway (three lanes in each direction) is 1.25 mi long-example-1
answered
User Bachi
by
7.8k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.