asked 234k views
1 vote
A manager tells her production employees, "It's no longer good enough that your work falls anywhere within the specification limits. I need your work to be as close to the target value as possible." Her thinking is reflective of: A. internal benchmarking. B. Six Sigma. C. ISO 9000. D. Taguchi concepts. E. process control charts.

asked
User Gfd
by
7.8k points

1 Answer

1 vote

Answer:

The answer is D. Taguchi concepts.

Step-by-step explanation:

The Taguchi method of quality control is an approach to engineering that emphasizes the roles of research and development (R&D), product design and development in reducing the occurrence of defects and failures in manufactured goods.

answered
User Gourav Garg
by
8.3k points

No related questions found

Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.