asked 232k views
0 votes
System-specific Validated Online Lifecycle Threat (VOLT) reports are required to be kept current and validated throughout the acquisition process. All Major Defense Acquisition Programs (MDAPs) must have a validated VOLT in place at:

1 Answer

1 vote

Answer:

System-specific Validated Online Lifecycle Threat (VOLT) reports are required to be kept current and validated throughout the acquisition process. All Major Defense Acquisition Programs (MDAPs) must have a validated VOLT in place at Milestones B and C.

answered
User Photon Light
by
7.7k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.