menu
Qamnty
Login
Register
My account
Edit my Profile
Private messages
My favorites
Engineers plan to develop a new drill for use on oil rigs. What should the engineers do first in order to develop the new drill
Ask a Question
Questions
Unanswered
Tags
Ask a Question
Engineers plan to develop a new drill for use on oil rigs. What should the engineers do first in order to develop the new drill
asked
Dec 14, 2022
227k
views
5
votes
Engineers plan to develop a new drill for use on oil rigs.
What should the engineers do first in order to develop the
new drill
Engineering
high-school
Hossein Mansouri
asked
by
Hossein Mansouri
8.7k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
4
votes
Answer:
Conduct research on features for a new drill
Step-by-step explanation:
Follow instagrm at ➜ mvnnyvibes
Fady Sadek
answered
Dec 19, 2022
by
Fady Sadek
7.7k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
Related questions
asked
May 8, 2024
209k
views
What machine do Helldivers use to harvest Helium-3 : a) Drill Drones b) Drill Rigs c) Harvesters d) Excavators
Skqr
asked
May 8, 2024
by
Skqr
9.0k
points
Computers & Tech
high-school
1
answer
5
votes
209k
views
asked
Aug 3, 2024
117k
views
Which statement best describes a solution to reduce the negative effects from mining or drilling? drill rigs use more diesel fuel instead of coal. heavy metals are stored in water storage tanks. mining
Yetimwork Beyene
asked
Aug 3, 2024
by
Yetimwork Beyene
8.0k
points
Engineering
college
1
answer
5
votes
117k
views
asked
Apr 11, 2016
4.9k
views
Q4. Oil rigs are used to drill for crude oil. a. Drill heads are made from steel. Steel is an alloy. Explain why Alloys are harder than pure metals. b. Drill heads also contain diamonds. Describe as fully
Mirronelli
asked
Apr 11, 2016
by
Mirronelli
7.7k
points
Chemistry
high-school
1
answer
3
votes
4.9k
views
Ask a Question
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.
Categories
All categories
Mathematics
(3.7m)
History
(955k)
English
(903k)
Biology
(716k)
Chemistry
(440k)
Physics
(405k)
Social Studies
(564k)
Advanced Placement
(27.5k)
SAT
(19.1k)
Geography
(146k)
Health
(283k)
Arts
(107k)
Business
(468k)
Computers & Tech
(195k)
French
(33.9k)
German
(4.9k)
Spanish
(174k)
Medicine
(125k)
Law
(53.4k)
Engineering
(74.2k)
Other Questions
A piston-cylinder device fitted with stops in the cylinder walls contains 2.1 kg of water initially at 150 kPa and 30 °C. Heat is transferred to the system until the final temperature reaches 250 °C. The
4. Which of the following is the first thing you should do when attempting to park? A. Securing the parking spot by standing in it B. Turning on your hazard lights C. Confirming the space can fit your
A water towers lowest point is 405 ft and the main line is 6 feet below the ground. The ground elevation is at 276 ft. The main line travels 2.9 miles. The pipe will travel through the following flanged
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qamnty