asked 202k views
5 votes
A construction crew needs to build a road that will be 20 miles long. The crew already completed a stretch that is 6.44 miles long and another that is 8.62 miles long.

How much more road does the construction crew need to build?

asked
User Yike Lu
by
8.2k points

2 Answers

5 votes
The answer is 15.3.
answered
User Wek
by
8.4k points
1 vote

Answer:

4.94 miles

Explanation:

Total that needs to be built: 20 miles

Already built: 6.44 miles and 8.62 miles

Already built: 6.44 miles + 8.62 miles = 15.06 miles

Amount still to be built: 20 miles - 15.06 miles = 4.94 miles

Answer: 4.94 miles

answered
User Venny
by
8.3k points

No related questions found

Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.