asked 63.1k views
1 vote
The sum of the speeds of two trains is 719.3 miles per hour. If the speed of the first train is 8.7 mph faster than that of the second train find the speeds of each.

What is the speed of the first train?

asked
User Patch
by
8.1k points

2 Answers

5 votes
The sum of the speeds of two trains is 719.3 miles per hour. If the speed of the first train is 8.7 mph faster than that of the second train find the speeds of each.
What is the speed of the first train?
answered
User Fseee
by
7.5k points
3 votes

Answer:

First train 364, second train 355.3

Explanation:

Let's me just say

First train = x

Second train = y

Easier to type like that

So

x + y = 719.3

they say " first train is 8.7 mph faster than that of the second train "

Therefore

x = y + 8.7

Now u have these two equations

x + y = 719.3

x = y + 8.7

Now since u know what is x, just put it in your first equation

x + y = 719.3

y + 8.7 + y= 719.3

2y = 710.6

= 355.3

Therefore the speed of the first train is

x + y = 719.3

x + 355.3 = 719.3

x =364

answered
User Biswajit Chopdar
by
8.3k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.