asked 207k views
5 votes
For a system level product support arrangement (PSA) with a Product Support Integrator (PSI) that includes metrcis of Material Avilability (AM) and Material Reliability (RM) ideally the PSI must maintain control over all applicable aspects of product support affecting system

a. True
b. False

asked
User Khoyo
by
7.8k points

2 Answers

0 votes
The answer is true !!
answered
User LarsH
by
8.6k points
5 votes
I think the answer is: True.
answered
User Farhan Ali
by
8.9k points