asked 205k views
4 votes
A pipeline is to be run to a resort community which is on an island 16 kilometres from the closest point on the shoreline. The water source for the pipe is 30 kilometres down the shore. If it costs $500/km to lay pipe through water and $300/km to lay pipe on land, at what point on the shoreline should the pipe turn into the water to minimize cost? What is the total cost?

asked
User Exaucae
by
7.5k points

1 Answer

4 votes

Answer:

  1. hi pero love you
  2. kiss you

Explanation:

helli

answered
User Scubabbl
by
8.5k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.