asked 93.2k views
0 votes
projects variable labor costs of $21,500 in March when 8,600 units are produced. If production is expected to drop to 8,000 units in April, what is the expected labor cost in April

asked
User Bold Bat
by
7.6k points

1 Answer

2 votes

Answer:

Total direct labor cost=$20,000

Step-by-step explanation:

First, we need to calculate the direct labor cost per unit:

Direct labor cost per unit= total cost / number of units

Direct labor cost per unit= 21,500 / 8,600

Direct labor cost per unit= $2.5

Now, the total cost for 8,000 units:

Total direct labor cost= 2.5*8,000

Total direct labor cost=$20,000