menu
Qamnty
Login
Register
My account
Edit my Profile
Private messages
My favorites
Find the velocity and rate of flow of water through a rectangular channel of 6m wide and 3m deep when it's running full. The channel is having a bed slope of 1 in 2000. Tak…
Ask a Question
Questions
Unanswered
Tags
Ask a Question
Find the velocity and rate of flow of water through a rectangular channel of 6m wide and 3m deep when it's running full. The channel is having a bed slope of 1 in 2000. Tak…
asked
May 18, 2022
70.3k
views
0
votes
Find the velocity and rate of flow of water through a rectangular channel of 6m wide and 3m deep when it's running full. The channel is having a bed slope of 1 in 2000. Take Chezy's coefficient, C=55
Engineering
college
Mes
asked
by
Mes
8.3k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
3
votes
Answer:
V = 1.5062 m/s
Step-by-step explanation:
look to the photos
Electrino
answered
May 25, 2022
by
Electrino
7.9k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
Related questions
asked
Aug 22, 2024
174k
views
A most efficient trapezoidal section is required to give a maximum discharge of 21.5 m³/s of water. The slope of the channel bottom is 1 in 2500. Taking C =70 m¹/²/s in Chezy's equation, determine the
Iarroyo
asked
Aug 22, 2024
by
Iarroyo
8.7k
points
Physics
high-school
1
answer
4
votes
174k
views
Ask a Question
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.
Categories
All categories
Mathematics
(3.7m)
History
(955k)
English
(903k)
Biology
(716k)
Chemistry
(440k)
Physics
(405k)
Social Studies
(564k)
Advanced Placement
(27.5k)
SAT
(19.1k)
Geography
(146k)
Health
(283k)
Arts
(107k)
Business
(468k)
Computers & Tech
(195k)
French
(33.9k)
German
(4.9k)
Spanish
(174k)
Medicine
(125k)
Law
(53.4k)
Engineering
(74.2k)
Other Questions
A water towers lowest point is 405 ft and the main line is 6 feet below the ground. The ground elevation is at 276 ft. The main line travels 2.9 miles. The pipe will travel through the following flanged
An activated sludge plant is being designed to handle a feed rate of 0.438 m3 /sec. The influent BOD concentration is 150 mg/L and the cell concentration (MLVSS) is 2,200 mg/L. If you wish to operate the
A car has an initial speed of 10 m/s. It then undergoes a constant acceleration of 0.05 m/s^2 over a distance of 5 km. Determine: a) The car final speed. b) The time needed to travel the 5 km.
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qamnty