What safety concerns must be addressed before welding on a large assembly outside of a welding booth?
Ask a Question
Questions
Unanswered
Tags
Ask a Question
What safety concerns must be addressed before welding on a large assembly outside of a welding booth?
asked
Oct 18, 2023
54.8k
views
12
votes
What safety concerns must be addressed before
welding on a large assembly outside of a welding
booth?
Engineering
college
Joseph Alcorn
asked
by
Joseph Alcorn
8.4k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
6
votes
Answer:
the clothing you wear, what's in the air (gases), surrounding and weather
Mukilarasan
answered
Oct 22, 2023
by
Mukilarasan
8.5k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
Related questions
asked
Feb 14, 2023
168k
views
A smaw station includes the arc welding machine, ____, electrode lead, workpiece lead, booth, workbench, stool, and ventilation.
G Ganesh
asked
Feb 14, 2023
by
G Ganesh
7.8k
points
Engineering
college
1
answer
5
votes
168k
views
Ask a Question
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.
Categories
All categories
Mathematics
(3.7m)
History
(955k)
English
(903k)
Biology
(716k)
Chemistry
(440k)
Physics
(405k)
Social Studies
(564k)
Advanced Placement
(27.5k)
SAT
(19.1k)
Geography
(146k)
Health
(283k)
Arts
(107k)
Business
(468k)
Computers & Tech
(195k)
French
(33.9k)
German
(4.9k)
Spanish
(174k)
Medicine
(125k)
Law
(53.4k)
Engineering
(74.2k)
Other Questions
4. Which of the following is the first thing you should do when attempting to park? A. Securing the parking spot by standing in it B. Turning on your hazard lights C. Confirming the space can fit your
A water towers lowest point is 405 ft and the main line is 6 feet below the ground. The ground elevation is at 276 ft. The main line travels 2.9 miles. The pipe will travel through the following flanged
An activated sludge plant is being designed to handle a feed rate of 0.438 m3 /sec. The influent BOD concentration is 150 mg/L and the cell concentration (MLVSS) is 2,200 mg/L. If you wish to operate the
Twitter