asked 215k views
2 votes
A road crew must repave a road that is 7/8miles long. They can repave1/56miles each hour. How long will it take the crew to repave the road?Write your answer in simplest form

1 Answer

3 votes

1) Gathering the data

The whole road: 7/8 miles long

Repaving speed: 1/56 mph

2) Considering that the Speed is found by:


\begin{gathered} S=(d)/(t) \\ (1)/(56)=((7)/(8))/(t) \\ t=(7)/(8)\cdot56 \\ t=49\text{ hours} \end{gathered}

Note that we cross multiplied that.

3) Hence, we can answer that the road crew is going to take 49 hours to repave it

answered
User Chris Ammerman
by
7.4k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.