asked 57.5k views
2 votes
A special drill is used at a construction site to dig holes. A hole is dug to a depth of 2.75 feet when the drill hits rock. The progress slows to 5/6 feet per hour of digging. The depth of the hole must be at least 10 1/2 feet by the end of the day to stay on schedule. What is the minimum amount of time the drill must continue at its present rate to complete the hole on schedule? Select from the drop-down menus to correctly complete the statement.

1 Answer

5 votes

Answer:

9.3 hrs to finish

Explanation:

(10.5 - 2.75)ft / (5/6 ft/hr) = 9.3 hrs to go

answered
User Pandy Legend
by
8.0k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.