menu
Qamnty
Login
Register
My account
Edit my Profile
Private messages
My favorites
Two points P(2,4,-1) and Q(12,16,9) form a straight line. Calculate the time taken for a sonar signal traveling at 300 m/s to get from the origin to midpoint of PQ.
Ask a Question
Questions
Unanswered
Tags
Ask a Question
Two points P(2,4,-1) and Q(12,16,9) form a straight line. Calculate the time taken for a sonar signal traveling at 300 m/s to get from the origin to midpoint of PQ.
asked
Jan 25, 2024
139k
views
4
votes
Two points P(2,4,-1) and Q(12,16,9) form a straight line. Calculate the time taken for a sonar signal traveling at 300 m/s to get from the origin to midpoint of PQ.
Engineering
college
Nick Borodulin
asked
by
Nick Borodulin
8.0k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
3
votes
Answer:
3853.56s
Step-by-step explanation:
Mayya
answered
Jan 30, 2024
by
Mayya
7.4k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
No related questions found
Ask a Question
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.
Categories
All categories
Mathematics
(3.7m)
History
(955k)
English
(903k)
Biology
(716k)
Chemistry
(440k)
Physics
(405k)
Social Studies
(564k)
Advanced Placement
(27.5k)
SAT
(19.1k)
Geography
(146k)
Health
(283k)
Arts
(107k)
Business
(468k)
Computers & Tech
(195k)
French
(33.9k)
German
(4.9k)
Spanish
(174k)
Medicine
(125k)
Law
(53.4k)
Engineering
(74.2k)
Other Questions
A piston-cylinder device fitted with stops in the cylinder walls contains 2.1 kg of water initially at 150 kPa and 30 °C. Heat is transferred to the system until the final temperature reaches 250 °C. The
A water towers lowest point is 405 ft and the main line is 6 feet below the ground. The ground elevation is at 276 ft. The main line travels 2.9 miles. The pipe will travel through the following flanged
An activated sludge plant is being designed to handle a feed rate of 0.438 m3 /sec. The influent BOD concentration is 150 mg/L and the cell concentration (MLVSS) is 2,200 mg/L. If you wish to operate the
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qamnty