Answer:
She painted 50 square meters in 2 square hours, so her painting rate is 50 square meters / 2 hours = 25 square meters per hour. The equation is
y = 50 - 25x
This equation represents the relationship between the area remaining to be painted (y) and the number of hours elapsed (x).
Explanation: