If the builder needs to install 10 doors in each of the 5 houses, then the total number of doors to be installed is:
10 doors/house x 5 houses = 50 doors
Since it takes 2 hours to install each door, the total time required to install all the doors is:
50 doors x 2 hours/door = 100 hours
Therefore, it will take the builder 100 hours to install all the doors. Answer: 100 hours.