Which type of flowchart scheduling technique has a fixed duration of production activities? In which type of flowchart are they probabilistic?
The ____ type of flow chart has a fixed duration for production activities. The ___ type has a probabilistic duration for production activities.
1. A. IPM, B. CPM or C. FDA
2. A. PACT, B. KENT, or C. PERT)

asked
User Wallter
by
8.1k points

1 Answer

4 votes
1. Cpm
2. PACT


From what I remember