asked 178k views
4 votes
The end result of a Sprint is:

Select one:
a. A product of a professional quality which fits the business need
b. A product which is barely sufficient for its purpose and deliberately not maintainable
c. A product of almost as good a quality as a Waterfall development
d. A technically-perfect, re-factored solution

asked
User Bagbyte
by
7.4k points

1 Answer

4 votes

Final answer:

The end result of a Sprint is a product of a professional quality which fits the business need.

Step-by-step explanation:

The end result of a Sprint is a product of a professional quality which fits the business need. This means that the product developed during the Sprint is of high quality and meets the specific requirements and goals of the business. It is not a product that is barely sufficient or deliberately not maintainable, and it is not necessarily of the same quality as a traditional Waterfall development. The focus is on delivering a technically-perfect solution that meets the needs of the business.

answered
User Seanbrant
by
8.1k points