What could the project team have used to ensure the slow boot time was addressed during planning?

1) Industry testing
2) Benchmarking
3) User acceptance testing
4) Prototypes

1 Answer

3 votes

Final answer:

To address slow boot time during project planning, the project team could have used benchmarking to compare performance, and thoroughly tested prototypes to ensure they meet requirements and constraints, including satisfactory boot times.

Step-by-step explanation:

Addressing Slow Boot Time During Planning

To ensure that a slow boot time is addressed during the planning phase of a project, the project team could have employed strategies such as benchmarking and the creation and testing of prototypes. Benchmarking would have allowed them to measure the performance of their system against industry standards or comparable systems. On the other hand, creating prototypes is a critical step in the design process as it provides an opportunity to test the design, evaluate performance, refine the design, and ensure it meets all requirements and constraints. Prototypes are essential for identifying any potential issues, such as slow boot times, before the product's final release.

The lack of thorough testing of prototypes could lead to issues being overlooked, as suggested by the fact that prototypes were not tested adequately. Through iterative testing and evaluation, engineers can focus on attributes of the product that are critical for user satisfaction, such as boot time, and work toward refining the prototype until it meets the desired criteria. This iterative process forms part of the spiral design process, where engineers generate ideas, evaluate solutions, design, and test prototypes to improve the design based on the results.