asked 31.9k views
1 vote
How long does a load-based schedule take to generate?

a) 1 second
b) 10 seconds
c) 5 minutes
d) It depends on the moon phase

asked
User Bjlevine
by
7.8k points

1 Answer

4 votes

Final answer:

The time taken to generate a load-based schedule can vary and depends on multiple factors such as complexity and system processing power.

Step-by-step explanation:

The load-based schedule generation time can vary depending on multiple factors, including the complexity of the schedule and the processing power of the system generating it. Therefore, the length of time to generate a load-based schedule cannot be determined solely based on the moon phase or specific timestamps like noon. It can range from a few seconds to several minutes, depending on the specifics of the scheduling process.

answered
User Rawa
by
8.0k points

No related questions found

Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.