asked 59.9k views
4 votes
Mr. Smith checked on the pool when he expected it to be half full, but he found that it was only ​⅜​ full. He found a leak near the bottom of the pool and realized it had been leaking from the very beginning. At what rate was the water leaking from the pool? Explain.

2 Answers

8 votes

Answer:

Explanation:

That's 18 gallons per minute.

14040 gallons / 18 gallons per minute = 780 min = 13 hours

answered
User Clark Kent
by
8.9k points
6 votes

Answer:

1/4 of the pool since the beginning

Explanation:

answered
User Cw
by
8.2k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.