asked 169k views
3 votes
Which budget evaluates the operation results at the actual level of activity?

A) Flexible budget
B) Master budget
C) Cash budget
D) Zero-based budget

asked
User Kylo Rey
by
8.0k points

1 Answer

4 votes

Final answer:

A flexible budget evaluates the operation results at the actual level of activity, providing a more accurate assessment of performance. Hence the correct answer is option A

Step-by-step explanation:

The correct answer is A) Flexible budget. A flexible budget evaluates the operation results at the actual level of activity by adjusting the budgeted amounts based on the specific level of activity achieved. It allows for variations in activity levels and provides a more accurate assessment of performance.

answered
User Richzilla
by
7.7k points

No related questions found