asked 127k views
5 votes
If MAPE is the performance criterion chosen by the administration, which forecasting method should it choose?

asked
User Treper
by
8.2k points

1 Answer

1 vote

Final answer:

If MAPE is the performance criterion chosen by the administration, they should choose the forecasting method with the lowest MAPE value.

Step-by-step explanation:

If MAPE is the performance criterion chosen by the administration, then the administration should choose the forecasting method with the lowest MAPE value. MAPE stands for Mean Absolute Percentage Error and it is a measure of forecasting accuracy. The lower the MAPE value, the better the forecast accuracy. For example, if one forecasting method has a MAPE of 5% and another has a MAPE of 10%, the method with the MAPE of 5% would be the preferred choice.

answered
User Wamadahama
by
7.7k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.