Final answer:
The amusement park studied methods like increasing the number of ride operators, implementing a fast pass system, and extending operating hours to decrease waiting time for rides.
Step-by-step explanation:
The amusement park studied several methods for decreasing the waiting time for rides:
- Increasing the number of ride operators: By having more operators, the park can load and unload riders more efficiently, reducing the wait time.
- Implementing a fast pass system: This allows visitors to reserve a specific time slot for a ride, reducing the time they spend waiting in line.
- Extending the operating hours: By extending the operating hours, the park can spread out the number of visitors over a longer period of time, reducing congestion and wait times.