asked 8.4k views
4 votes
After controls to minimize risk in the environment have been applied, what is the remaining risk called?

A. Remaining risk
B. Mitigated risk
C. Managed risk
D. Residual risk

1 Answer

2 votes

Final answer:

The remaining risk after all controls have been applied is referred to as Residual risk, which is the level of risk that remains after mitigation efforts.

Step-by-step explanation:

After controls to minimize risk in the environment have been applied, the remaining risk is called Residual risk. This is the risk that remains after all efforts to identify and eliminate risk have been made. It's important to note that it's nearly impossible to eradicate all risks, and there will always be some level of risk left which needs to be accepted or further mitigated.

For example, a company may implement a variety of security measures to protect its data, but there will likely still be a small chance of a data breach due to unforeseen vulnerabilities.

answered
User Leaksterrr
by
8.6k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.