Job 910 was recently completed. The following data have been recorded on its job cost sheet: Direct materials $ 2,430 Direct labor-hours 70 labor-hours Direct labor wage rate $ 20 per labor-hour Machine-hours 134 machine-hours The Corporation applies manufacturing overhead on the basis of machine-hours. The predetermined overhead rate is $21 per machine-hour. The total cost that would be recorded on the job cost sheet for Job 910 would be:

asked
User Riofly
by
8.6k points

1 Answer

10 votes

Answer:

6644

Explanation:if u do the math whith your numbers you should get the answer