asked 117k views
2 votes
The most detailed method of estimating a reproduction cost for a structure is

a. comparative unit
b. index
c. quantity survey
d. square foot

asked
User LarryH
by
8.6k points

1 Answer

4 votes

Final answer:

The quantity survey method is the most detailed for estimating the cost to reproduce a structure, as it involves a thorough evaluation of all aspects of construction.

Step-by-step explanation:

The most detailed method of estimating the reproduction cost for a structure is a quantity survey. This method is more comprehensive and detailed than the comparative unit, index, or square foot methods, as it involves a thorough assessment of all materials, labor, transport, and any other costs that would be necessary to replicate the structure. This approach requires a breakdown of the project into specific components, and it is often used for unique or complex projects where standardized units might not be sufficient for an accurate estimate.

answered
User Rubal
by
8.9k points

No related questions found

Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.