Baird Manufacturing Company makes tents that it sells directly to camping enthusiasts through a mail-order marketing program. The company pays a quality control expert $52,500 per year to inspect tents and ensure that they meet the company's quality standards.

Required:
Classify the quality control costs as either fixed or variable.
Calculate the quality control cost per unit if the company produces 10,000 tents per year.

asked
User Xsveda
by
8.7k points

1 Answer

6 votes

Final answer:

The quality control cost at Baird Manufacturing Company is a fixed cost at $52,500 per year. The cost per unit for quality control when producing 10,000 tents is $5.25 per tent.

Step-by-step explanation:

The quality control costs at Baird Manufacturing Company are classified as fixed costs, as they do not vary with the level of output and remain constant at $52,500 per year. To calculate the quality control cost per unit for 10,000 tents produced in a year, we would divide the total annual quality control cost by the number of units produced.

Quality control cost per unit = Total quality control cost / Number of tents produced

Quality control cost per unit = $52,500 / 10,000 tents

Quality control cost per unit = $5.25 per tent