asked 15.1k views
3 votes
The Design Basis Threat (DBT) Report is what Appendix on the RMP? A. Appendix C B. Appendix B C. Appendix A D. Appendix E

asked
User Ulver
by
8.2k points

1 Answer

1 vote

Final answer:

The Design Basis Threat (DBT) Report is generally found in Appendix B of the Risk Management Plan (RMP), providing an analysis of potential threats to determine security requirements for a facility.

Step-by-step explanation:

The Design Basis Threat (DBT) Report is a critical component of the Risk Management Plan (RMP) and its presence is intended to provide insight into potential internal and external threats that can affect a facility's operations. While the specific appendix that the DBT Report is located in can vary based on the RMP version or specific regulatory environment, in most contexts, the Design Basis Threat (DBT) Report is typically found in Appendix B of the Risk Management Plan (RMP). The DBT analyzes potential threats to determine security requirements and to create a basis for the design of a physical protection system.

answered
User Ryler Hockenbury
by
8.4k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.