For a CMU project that requires Level B quality assurance, when does the f'm have to be verified?

asked
User Albeis
by
8.3k points

1 Answer

5 votes

Final answer:

In a CMU project requiring Level B quality assurance, the f'm needs to be verified during the testing phase. Verification ensures the system meets the desired reliability and performance levels.

Step-by-step explanation:

In a CMU project that requires Level B quality assurance, the f'm (or mean failure metric) needs to be verified during the testing phase of the project. Level B quality assurance is one of several levels defined in the Capability Maturity Model Integration (CMMI), which is a framework for process improvement in software development.

Verification of the f'm involves checking that the calculated mean failure metric aligns with the expected values based on the requirements and specifications of the project. This verification ensures that the system being developed meets the desired levels of reliability and performance.

For example, if the f'm is defined as the average number of failures per unit test, it should be calculated and compared against the specified threshold to ensure that it falls within the acceptable range. This verification helps detect any potential issues or deviations from the expected performance levels.

answered
User Muhammad Mansha
by
8.1k points

Related questions

1 answer
1 vote
156k views
asked Dec 12, 2024 213k views
Necole asked Dec 12, 2024
by Necole
7.6k points
1 answer
0 votes
213k views
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.