Answer:
The type of construction in this case is commercial construction. This is because the hotel will be used for commercial purposes, specifically to provide accommodation to paying guests.
For the friction pile foundation, the materials needed will include concrete and steel. Workers will be required to drill holes into the ground and insert steel reinforcing bars into them. The holes will then be filled with concrete to create a solid foundation. Workers such as concrete pourers, foundation drillers, and steelworkers will be required for this part of the project.
For the glass curtain wall, materials needed will include glass panels, metal framing, and sealant. Workers such as glaziers, metal fabricators, and caulking specialists will be required to install the glass panels and metal framing. The sealant will be used to create a weather-tight seal between the glass panels and the metal framing.
Carpenters will contribute to the project by constructing the interior walls, installing doors and windows, and creating millwork such as cabinets and shelves. They will need materials such as wood, nails, screws, and drywall.
Ironworkers will contribute to the project by erecting the steel framework for the building. They will need materials such as steel beams, bolts, and welding equipment to do their jobs.
Step-by-step explanation: