To make 150 telephones, ComTech, Inc. had these manufacturing costs: materials $1,282.29; labor, $1,975.26; factory overhead, $1,234.31. What was the prime cost of making the

telephones? What was the total manufacturing cost of each phone. on average. to the nearest whole cent

1 Answer

1 vote

Answer:

The prime cost of making the 150 telephones is the total cost of materials and labor, which is $3,257.55. The total manufacturing cost of each phone, on average, is $21.72 to the nearest whole cent. The factory overhead cost of $1,234.31 is spread out over all of the telephones and is not factored into the prime cost

Step-by-step explanation: