menu
Qamnty
Login
Register
My account
Edit my Profile
Private messages
My favorites
A new sidewalk will be 4 feet wide, 120 feet long, and filled to a depth of 9 inches (0.75 foot) with concrete. How many cubic yards of concrete are needed?
Ask a Question
Questions
Unanswered
Tags
Ask a Question
A new sidewalk will be 4 feet wide, 120 feet long, and filled to a depth of 9 inches (0.75 foot) with concrete. How many cubic yards of concrete are needed?
asked
Jan 9, 2024
139k
views
3
votes
A new sidewalk will be 4 feet wide, 120 feet long, and filled to a depth of 9 inches (0.75 foot) with concrete. How
many cubic yards of concrete are needed?
Mathematics
college
Mark Ursino
asked
by
Mark Ursino
7.8k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
7
votes
Answer:
40 cubic yards
Explanation:
Shane N
answered
Jan 16, 2024
by
Shane N
7.9k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
No related questions found
Ask a Question
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.
Categories
All categories
Mathematics
(3.7m)
History
(955k)
English
(903k)
Biology
(716k)
Chemistry
(440k)
Physics
(405k)
Social Studies
(564k)
Advanced Placement
(27.5k)
SAT
(19.1k)
Geography
(146k)
Health
(283k)
Arts
(107k)
Business
(468k)
Computers & Tech
(195k)
French
(33.9k)
German
(4.9k)
Spanish
(174k)
Medicine
(125k)
Law
(53.4k)
Engineering
(74.2k)
Other Questions
How do you can you solve this problem 37 + y = 87; y =
How do you estimate of 4 5/8 X 1/3
A bathtub is being filled with water. After 3 minutes 4/5 of the tub is full. Assuming the rate is constant, how much longer will it take to fill the tub?
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qamnty