asked 189k views
11 votes
The 95% confidence interval for these parts is 56.98 to 57.05 under normal operations. A systematic sample is taken from the manufacturing line to determine if the production process is still within acceptable levels. The mean of the sample is 56.96. What should be done about the production line

1 Answer

3 votes

Answer:

Stop the line of production since the sample mean (56.96) is outside the confidence interval [
CI_(0.95) = ( 56.98, 57.05 )]

Explanation:

Given that;

95% confidence interval for these parts is 56.98 to 57.05


CI_(0.95) = ( 56.98, 57.05 )

Sample mean = 56.96

We know that;

If the sample mean is within the confidence interval then, our decision is to keep the line operating as it is inside the confidence interval.

But if the sample mean is not within the confidence interval them, our decision is to stop the line of production as it is outside the confidence interval.

Now since our mean sample (56.96) does not lie between with the 95% confidence interval
CI_(0.95) = ( 56.98, 57.05 ).

Therefore, Stop the line of production since the sample mean (56.96) is outside the confidence interval [
CI_(0.95) = ( 56.98, 57.05 )]

answered
User Jozcar
by
7.1k points

No related questions found

Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.